Water Projects

Print PDF

End Client: Dubai Municipality

Project: Jebel Ali Sewage Treatment Plant. Capacity- 300,000. Cubic Meter /Day

Consultant: MWH

Main Contractor: Al Ahamadiah Aktor JV

Location: Dubai

Scope: Design, Supply, Installation and Commissioning of 5 x 11kV Substation (ABB Unigear ZS1 Switchgear), 16 x L.V Panels from 1200Amps to 6300Amps, 31x L.V. MCC from 630A to 5000A, 14x VFD panels of 630KW motor capacity, 47x Detuned capacitor banks from 70kVAR to 900kVAR, 17x Active harmonic filters of 200A to 600Amps, Distributed RIO system for data collection over 10,000 I/O Points.

System Study - Load flow analysis, Short Circuit Calculation, Discrimination and Selectivity Study. Harmonic Analysis.

Field Installation: Installation of All MV Panels, DC System, NiCad Battery Cabinets, Termination of all 11KV and 6.6KV Cables, Installation of Harmonic Filters.

 

End Client: Dubai Municipality

Project: Main Pumping Station.

Consultant: Kathib and Alami

Main Contractor: Wade Adams

Location: Dubai

Scope: Design, Supply, Installation and Commissioning of 11 KV Substation (ABB Unigear ZS1 Switchgear), 1x L.V Panel of 2500Amps, 1x L.V. MCC from 5000A, 4x VFD panels for 630KW motor capacity, 1x Detuned capacitor bank 300kVAR, 4x Active harmonic filters of 400Amps, Generator Synchronization Panel 4000Amps, Citech SCADA System, ABB -RTU.

System Study - Load flow analysis, Short Circuit Calculation, Discrimination and Selectivity Study. Harmonic Analysis.

Field Installation: Installation of All MV Panels, DC System, NiCad Battery Cabinets, Installation of Harmonic Filters.

 

End Client: Nakheel

Project: Gardens Sewage Treatment Plant. 33,000 Cubic Meter/Day

Consultant: Associated Consulting Engineers.

Main Contractor: Eagle Electromechanical Co. L.L.C

Location: Dubai

Scope: Design, Supply and Commissioning of, L.V Panels of 2500Amps,L.V. MCC up to 2000Amps, Detuned capacitor bank 300kVAR, Generator Synchronization Panel 2500Amps, Citech SCADA System, GE Fanuc PLC system.

 

End Client: Nakheel

Project: Palm Jumeirah Polishing Plant

Consultant: KEO International.

Main Contractor: Metito Overseas

Location: Dubai

Scope: Design, Supply and Commissioning of, L.V Panel of 2500Amps, L.V. MCC up to 2000Amps, Detuned capacitor bank 300kVAR, Automation Panel with Allen Bradley PLC.