Infrastructure Projects

Print PDF

End Client: TDIC

Project: Sadiyat Beach Residential Infrastructure.

Consultant: Parsons International

Main Contractor: Hilal Bil Badi and Partners.

Location: Abu Dhabi

Scope: Supply, Installation and commissioning of 22 KV Substation (ABB Safe plus Switchgear), 42 x 22/0.4kV Transformers, DC System, and DMS interface Panels, 21 LV Distribution Panels.

System Study - Load flow analysis, Short Circuit Calculation, Discrimination and Selectivity Study.

Field Installation: Installation of All MV Panels, DC System, NiCad Battery Cabinets,

 

End Client: RAK Properties

Project: Mina Al Arab Infrastructure Phase -1.

Consultant: Halcrow International

Main Contractor: Eagle Electromechanical L.L.C

Location: Ras Al Kaimah

Scope: Design, Supply, Installation and Commissioning of 18x L.V Panels and 125x Feeder pillars.

 

End Client: Nakheel

Project: Discovery Garden Infrastructure

Consultant: Wilber smith Associates.

Main Contractor: Al Nabooda Engineering.

Location: Dubai

Scope: Design, Supply and Commissioning of, 9x MCC with Detuned capacitor banks, 25x Feeder pillars, GE Fanuc Automation System.

 

End Client: Department of Military Works.

Project: Mina Zayed French Naval Base

Consultant: DMW

Main Contractor: Trust Construction.

Location: Abu Dhabi

Scope: Design, Supply and Commissioning of, L.V Panel of 2500Amps, L.V. Power post 50Hz and 60 Hz,

Feeder Pillars.